The building had developed serious defects affecting support to balconies and the stability of the front facade. The defects mainly arose from failure to adequately maintain the fabric of the building over a number of years.
We prepared a detailed structural scheme, including temporary works proposals, to enable the balconies to be properly supported and for the replacement of the brick mullions and lintols at the lower floor levels.